PROJECTS PORTFOLIO
PRIVATE RESIDENCE
Mercer Island, WA
2017
This project included painted soldier piles in 30" diameter shafts with treated lagging. Existing retaining walls and drainage system were also improved during the course of construction.
HARBOR HILL DRIVE EXTENSION
Gig Harbor, WA
2017
For the City of Gig Harbor we installed 105 soldier piles, 5,800 square feet of lagging, 740 soil nails, and 9,800 square feet of shotcrete.
VERIZON CELL TOWER FOUNDATION
Centralia, WA
2017
This 8' diameter by 40' deep foundation was installed utilizing CMP, temporary casing, and a slurry system.
EMERGENCY SEWER REPAIR
Seattle, WA
2017
This project for the City of Seattle on Denny Way required installing a 7.5' x 10' temporary casing and a 6.5' x 10' permanent casing.
RETAINING WALL
Camano Island, WA
2018
This project was for a private community on Camano Island. 35 soldier piles and 3,300 SF of lagging were installed.
SUBSTATION, SWITCHYARD, TRANSMISSION
Northeast Oregon
2018
Installed 42"-96" diameter foundations, 13'-30' deep.
PSERN TOWER FOUNDATIONS
Skykomish, WA
2018
Installed four 5' x 26' drilled pier foundations for a Puget Sound Emergency Radio Network Tower.